beer plant equipment 50HL

muller fermentor, 5000Lmicrobrewery equipment_beerequipment_fermentor_keg equipment , These equipment, capable support dailycapacity 5000--20000L . under Normal operation, it can be upgraded to 1

  • Model: 50HL beer plant equipment

muller fermentor, 5000Lmicrobrewery equipment_beerequipment_fermentor_keg equipment ,  These equipment, capable support dailycapacity  5000--20000L .   under Normal operation,  it can be upgraded to 10tatches per 22 hours, that is to say, max brew house capacity is 50KL daily.

 It is support automatic operation ;

malt  auger---roll mill---malt -tun-lautertun-brew kettle-whirlppol,  cooling systemfermentor,  keg filling and bottle filling line

 

packing line shold be controlled by PlC or Logo  system into keg orbottle. 

 

brew house all insulated with mineral wool, or PU, or heat resistancematerial; 

For baterial resisting reason, all tank polished to 0.4--0.2 um inside ;

 For safe quanlity reason,  Chiller system should be one in running, anotherone for standby .

 

Another important  information:  besides beer,  drinks, and founctional liquor like  RED BULKS, COCA COLA, some healthy drinks are also capable,  brewtech is directly  from same fermentors, and different skills in need.  contact us forfurther information.

microbrewery equipment| beerequipment|fermentor|keg equipment, pectin euqipment, dietary fibre, beer keg, kegerator,homebrew, drinks filling




    item

No.

 description

Spec.

Powercapacity

quanity

material

 remark

one

wormfedding

 

01

Wormsource box

 

60L

100W

1


Feedworm in


02

Feedingbox

160L

300W

1




03

Acceptingbox

350L

30W

1

glass



04

Sterilizingpot

30L

2.2KW

1




05

accessaries



Oneparcel



Brewhouseequipment

06

Rollmill

480kg/h

31kw

1




07

Whirlpool/mashtun unit

5t/*

0.75kw

1 

s/s(stainlesssteel)



08

Hotliquor

5t/*


1 

s/s



09

lautertun

5t/*

0.75kw

1 

s/s

* 


10

wort pump

3t/h

1.1kw

1 

s/s



11

Pump 

5t/h

0.75kw

1 

s/s


Three

fermentation

12

fermentor

5t/*


24

s/s+carbon steel for shell



13

Wormadder

50L


1 

s/s



14

Sodatanks

500L


1 

s/s



15

Formaldehyde

500L


1 

s/s



16

CIP UNIT

3t/h

0.75kw

1 

s/s


Four.

Coolingunit

17

Plateexchanger

10m2


1 

s/s

Twostage


18

Venture tube



1 

s/s



19

refregerator


3.75kw

2




20

Iceand water tank

3t


2 

Carbonsteel



21

condenser



1 




22

pump



2



Five

accessaries

23

Aircompressor


2.5kw

1 




24

boiler

0.35t/h


1 

Gas boier



25

Controllingboard







26

meters



Oneparcel




40 FCL x40 ,  

It is suggested to install the tanks at site.